03 December 2012
Application 12/12041/FULL has been submitted for: DEVELOPMENT SITE INCL. 12-13 SHERWOOD STREET & 63-75 BREWER STREET: External alterations & extensions including rebuilding of existing seventh & eight floor levels, installation of PV cells, green roof & plant, alterations to Brewer Street & Sherwood Street elevations & rebuilding of rear elevations (with new balconies on Smith Court and Piccadilly Theatre elevations & roof terraces at eight floor level on all frontages); provision of 38 dwellings (7 x studios, 9 x 1 bedroom, 12 x 2 bedroom and 10 x 3 bedroom) at fourth to eight floors of 12 Sherwood Street, with new residential entrance to Sherwood Street (adjacent refuse store); use of second & third floor as offices (Class B1); reconfiguration of existing uses at basement, ground & first floor levels at 12/13 Sherwood Street & 63-75 Brewer Street to provide 2 No. retail (Class A1) units & altered health club (Class D2) layout with new health club entrance on Brewer Street.
30 November 2012
Application 2012/6338/P has been submitted for: Redevelopment of Bacton Low Rise Estate, Gospel Oak District Housing Office and Vicar's Road workshops following the demolition of all existing buildings (99 Class C3 residential units Nos. 121-219 Bacton Low Rise; Class B1 offices at 115 Wellesley Road; Class B1 workshops at 2-16 Vicar's Road), to provide within buildings ranging from 2-8 storeys in height a total of 290 Class C3 residential units, comprising 170 market, 10 intermediate and 104 social rent units, 3 employment units (Class B1), new and altered public realm, landscaping, vehicular and pedestrian links/accesses, vehicular and cycle parking, bin storage and associated works.
30 November 2012
Application 2012/0406 has been appealed under reference 2186057 further to its refusal on 11/06/2012.
30 November 2012
Application 12/04581 has been submitted for: Redevelopment of the former Annie McCall hospital site including extension at roof level and conversion of the existing building to create 13 residential units; conversion of 37-39 Jeffrey's Road to create 8 residential units; erection of a new 4 storey corner block to create 8 affordable housing units and erection of a part single, part two storey building to the rear of the site accommodating 350m2 of B1 space and a 2 storey dwelling with associated hard and soft landscaping cycle and refuse storage (Town Planning and Listed building Consent)
30 November 2012
Application PP/07/01346 has been withdrawn.
29 November 2012
The borough has resolved to grant application 2012/4741/P - the s106 is not yet signed.
29 November 2012
Application P1468.12 has been submitted for: Proposed food store within Class A1(retail) use, petrol filling station, associated parking and landscaping, alterations to existing access to Rom Valley Way and formation of new access/egress on to Rom Valley Way; and outline planning application for a residential scheme of up to 71 units comprising a mix of 3 bedroom town houses and two blocks of 1 and 2 bed flats(access only to be considered)
29 November 2012
The borough has resolved to grant application 12/1708/F - the s106 is not yet signed.
29 November 2012
Application 12/04546/FUL has been submitted for: Demolition of existing buildings and change of use/redevelopment of the site to provide 58 residential units comprising 18 dwelling houses and 40 flats in buildings ranging between 2 and 4 storeys in height together with the provision of 75 car parking spaces, associated landscaping works including the provision of private gardens and communal amenity space, revised access arrangements, cycle parking and refuse and recycling storage.
29 November 2012
Application 12/03203/P has been submitted for: Refurbishment and use of ground to 6th floors as a 144 bedroom hotel with basement car parking spaces, and use of floors 7 to 12 as 26 two bedroom, 15 one bedroom and 5 three bedroom flats; erection of ground floor extensions, environmental improvements to both the Wellesley and Walpole Road at grade frontages including the provision of secure cycle storage, a hotel service yard, disabled parking, a vehicle and coach drop off area, 2 disabled parking spaces, 4 car club parking bays , motorcycle parking and general landscape improvements.
29 November 2012
The borough has resolved to grant application 2012/4628/P - the s106 is not yet signed.
28 November 2012
Application 12/11911/FULL has been submitted for: Demolition of existing buildings at western end of the site and redevelopment of the western end of the site (fronting on to Hermitage Street) comprising erection of a building of between 2 and 15 storeys in height to provide 150 residential units (Class C3); flexible affordable business (Class B1) or social and community space (Class D1/D2); ground floor retail uses (Class A1 and/or Class A3) and a gym (Class D2). Associated provision of landscaping and open space; highways works, including widening Hermitage to accommodate two way vehicular traffic; new vehicular and pedestrian accesses; off-street ground floor service bay in Hermitage Street; and two storey basement comprising car, cycle and motorcycle parking, an energy centre and ancillary servicing space (EIA Development).
28 November 2012
Application 12/00501/FUL has gained full planning permission.
28 November 2012
Application 12/AP/2444 has gained full planning permission.
28 November 2012
The borough has resolved to grant application P/2012/3391 - the s106 is not yet signed.
27 November 2012
Application PP/12/03067 has gained full planning permission.
27 November 2012
The borough has resolved to grant application 12/03365/REM - the s106 is not yet signed.
27 November 2012
The borough has resolved to grant application P12-00165PLA - the s106 is not yet signed.
27 November 2012
The borough has resolved to grant application P12-01709PLA - the s106 is not yet signed.
26 November 2012
Opinion has been sought under ref 2012/1597/EIA Regs for: EIA screening opinion. Demolition of existing industrial and commercial units to make way for the development of 495 residential units, 15327 m2 students accommodation, 3640 m2 commercial floor space as well as pedestrian links and landscaping features.