13 December 2012
Application 12/AP/3023 has gained full planning permission.
13 December 2012
The borough has resolved to grant application PA/12/02228 - the s106 is not yet signed.
13 December 2012
The borough has resolved to grant application PA/12/02131 - the s106 is not yet signed.
13 December 2012
Application 2012/5780 has been submitted for: Alterations and extensions to Winward and Leeward Houses including remodelling of elevations, erection of two additional floors and six-storey extensions to rear elevations; demolition of 1 and 8 Square Rigger Row and erection of four and six-storey buildings respectively; erection of additional floor to Port House; installation of structural framework to elevations and roofs fronting York Place. Alterations and extensions in connection with formation of 25 flats (part through change of use) and office accommodation (Class B1). (Renewal of planning permission 2009/3804 dated 19.07.2010).
13 December 2012
Application 2009/3853 has been submitted for: Erection of part five, part six additional floors to Trade Tower following removal of existing 12th and 13th floors. Alterations to entrance fronting Gartons Way including installation of structural framework to ground and first floors. Alterations and extensions in connection with the formation of 18 flats (net increase of 16 flats).
13 December 2012
The borough has resolved to grant application 2012/4584 - the s106 is not yet signed. The unit total is confirmed as 800, all private.
12 December 2012
The borough has resolved to grant application 12/2612 - the s106 is not yet signed.
12 December 2012
Application 2012/0099/P has gained full planning permission.
12 December 2012
Application 12/03365/REM has gained full planning permission.
12 December 2012
The borough has resolved to grant application PA/12/01803 - the s106 is not yet signed.
12 December 2012
Application PA/12/03247 has been submitted for: Erection of buildings ranging in height from 3 to 5 storeys with rooftop pavilions rising to 6 storeys, providing 173 residential units (Use Class C3) with underground parking, open space, plant and associated community building (Class D1).
12 December 2012
Application PA/12/03248 has been submitted for: Erection of residential (Class C3) led mixed use 75 storey tower (239mAOD) comprising 864 residential units and 84 serviced apartments (Class C1), and associated amenity floors, roof terrace, basement car parking, cycle storage and plant, together with an amenity pavilion including retail and open space.
11 December 2012
Application 45200/APP/2012/3082 has been submitted for: Comprehensive redevelopment of site to provide three buildings of part 9 storeys, part 7 storeys and part 5 storeys comprising 241 residential units, 190 sqm (approx) of Use Class D1 floor space, and 64 sqm (approx) of Use Class A1 floor space with associated public & private amenity space, hard & soft landscaping, lower ground floor parking for vehicles and bicycles, and alterations to 9 High Street to form new pedestrian route. (Involving demolition of all existing buildings
11 December 2012
Application PP/12/04968 has been submitted for: Reconfiguration of existing residential floorspace at 4th floor (6 units existing). Extension of residential floorspace at 4th floor by provision of additional space at 5th floor, to create duplex units. Provision of 6 units in total.
11 December 2012
Application 12/04711/FUL has been submitted for: The redevelopment of the site, involving demolition of the disused print works to the rear, the erection of an additional storey to the main building fronting Leigham Court Road and the erection of a six storey building to provide retail (A1 use) at ground floor level in the existing building and 35 self contained apartments on the upper floors together with cycle and refuse storage and landscaping. (Town Planning and Conservation area consent)
11 December 2012
Application 12/AP/2702 has gained full planning permission.
11 December 2012
The borough has resolved to grant application 12/AP/2942 - the s106 is not yet signed.
11 December 2012
The borough has resolved to grant application 12/07686/FULL - the s106 is not yet signed.
10 December 2012
Application 12/03491/P has been submitted for: Conversion, extension and partial demolition of the existing building to provide up to 288 flats up to 95sqm (GIA) A3 floor space at ground floor level along Park Lane (building A) up to 404 sqm (GIA) of non residential floor space at ground floor level along Park Street (building B) to be provided as either A1/D1 (excluding place of worship) /D2 (excluding cinema) use or a combination of these uses, together with other works associated with the development including public realm, private residential amenity space, access arrangements, reconfiguration of the basement to retain car parking (with provision of accessible car parking and car club spaces) and to provide cycle parking, servicing arrangements and utilities infrastructure; the extension includes up to an additional 5 storeys on building A, including roof gardens at levels 23,25 & 28 an additional 3 storeys, including roof gardens at levels 6 and 8 on building B; the demolition is for removal of the existing bridge link of building B over St George's Walk and for the removal of links between buildings A & B from first floor level upwards
10 December 2012
Application DC/12/82000 has been submitted for: The remodelling, repair, restoration and conversion of two existing buildings (A and C) to provide new commercial uses (4031 sqm of Use Class B1) with associated plant, servicing and storage. Demolition of Building B and the construction of four new buildings ranging from 6 to 12 storeys to provide 148 residential units (62 x one-bed, 69 x two bed and 17 x 3 bed), and new commercial uses (703 sqm of Use Class B1) together with new open space, landscaping, car and cycle parking at Faircharm Trading Estate, Creekside, SE8 3DX.