26 October 2024
Permission DM2019/01309 has lapsed unimplemented.
25 October 2024
Cordage 27 Limited was successful with appeal reference 3331137 against refusal of planning application 21/06145/FUL on 25/10/2024. • Permission took 145 weeks from the original application. • It is currently a substantial detached care home. • The new scheme will include two apartment blocks. • With a maximum height of four storeys. • There will be 31 residential units: 25 private, 6 affordable. • The affordable is 6 Intermediate tenure First Homes.
25 October 2024
Sintl was successful with application 23/P1435, which was approved under delegated powers on 25/10/2024. • Permission took 69 weeks from the original application. • It is currently a vacant 1960's building and linked Grade II Listed building, both in office use. • The new scheme will include conversion and extension of the two existing buildings. • With a maximum height of five storeys. • There will be 25 residential units: 25 private, 0 affordable.
25 October 2024
Application 24/00989/OUT has been submitted for: Outline planning permission, with all matters reserved for 2 separate freestanding sites: Site A - Non-Safeguarded Land a) A mixed-use development (to be delivered in separate severable phases) to provide new buildings to accommodate new homes (Use Class C3), flexible non-residential uses (Use Classes E, F2 and sui generis (drinking establishments, drinking establishments with expanded food provision, cinema and entertainment venues)), energy centre, public open space and public realm, associated car and cycle parking, formation of new pedestrian and vehicular accesses and means of access within the site. Site B - Safeguarded Land b) A single phase mixed-use development to provide new buildings to accommodate new homes (Use Class C3), flexible non-residential uses (Use Classes E, F2 and sui generis (drinking establishments, drinking establishments with expanded food provision, cinema and entertainment venues)), energy centre, public open space and public realm, associated car and cycle parking, formation of new pedestrian and vehicular accesses and means of access within the site.
24 October 2024
Application 244029VAR has been submitted for: Phase 3: Minor Material Amendment (S.73) to vary condition 2 (approved documents) involving increasing the number of homes from 185 to 188 homes alterations to the floor plans including removal of undercroft parking in Block C3 creation of a substation for Phase 3 within Block C2 consolidation of cycle storage larger plant room within Block C1 internal corridor layout amendments to external landscape space additional on-street carparking spaces relocation of bulky waste store in Block C1 and the provision of a communal roof terrace at 9th floor of Block C1.
23 October 2024
Application HGY/2024/2388 has gained Prior Approval.
23 October 2024
LLDC application 24/00063/FUL has gained full planning permission.
23 October 2024
Application 20/AP/3482 has gained full planning permission.
22 October 2024
Application 24/4057/FUL has been submitted for: Large Scale Purpose Built Shared Living (sui generis use) led development, proposals include demolition of the existing buildings, erection of 3 blocks of between 6 and 9 Storeys connected by a 2 storey central building, 331 Shared Living residential units with ancillary communal facilities and amenity spaces to be located at upper floors, flexible town centre (Class E use) units and a drinking establishment (sui generis use) are proposed at ground floor alongside cycle parking, 2x accessible parking bays, and mechanical plant.
22 October 2024
Application DC/24/137871 has been submitted for: Hybrid planning application for the comprehensive, phased redevelopment of land at Lewisham Shopping Centre and associated buildings, including properties and land on Molesworth Street, Lewisham High Street and Rennell Street, comprising: Full planning application (within Phase 1a) comprising the demolition of existing buildings, structures and associated works to provide a mixed-use development including the construction of a Co-Living building (Sui Generis) up to 23 storeys in height (Plot N1), and a residential building (Class C3) up to 15 storeys in height (Plot N2), associated residential ancillary spaces as well as town centre uses (Class E (a, b, c, d, e, f, g (i, ii)); and Sui Generis) together with public open space, public realm, amenity space and landscaping, car and cycle parking, highway works and the formation of new pedestrian and vehicle accesses, existing shopping centre interface works (including the 'Phase 1a Finish Works'), service deck modifications, servicing arrangements, site preparation works, supporting infrastructure works and other associated works. Outline planning application (all matters reserved) for a comprehensive, phased redevelopment, comprising demolition of existing buildings, structures and associated works to provide a mixed-use development including: The following uses: - Living Uses, comprising residential (Class C3) and student accommodation (Sui Generis); - Town Centre Uses (Class E (a, b, c, d, e, f, g (i, ii)) and Sui Generis); - Community and Cultural uses (Class F1; F2; and Sui Generis); - Music, performance and event venue (Sui Generis) - Public open space, public realm, amenity space and landscaping works; - Car and cycle parking; - Highway works; - Formation of new pedestrian and vehicular accesses, permanent and temporary vehicular access ramps, service deck, servicing arrangements and means of access and circulation within the site; - Site preparation works; - Supporting infrastructure works; - Associated interim works; - Meanwhile and interim uses; and - Other associated works
22 October 2024
Barratt London was successful with application DC/23/133854 at planning committee on 22/10/2024. • Permission took 47 weeks from validation. • It is currently vacant brownfield land. • The new scheme will include six apartment blocks. • With a maximum height of 14 storeys. • There will be 262 residential units: 191 private, 71 affordable. • The affordable is 37 London Affordable Rent, 34 Shared Ownership.
22 October 2024
Application 24/P1891 has gained Prior Approval.
22 October 2024
Hadley Property Group was successful with application 23/00441/FUL at planning committee on 22/10/2024. • Permission took 39 weeks from the original application. • It is currently occupied by temporary meanwhile uses. • The new scheme will include four apartment blocks and two PBSA blocks. • With a maximum height of 32 storeys. • There will be 672 Class C3 residential units: 500 private, 172 affordable. • The affordable is 172 Social Rent.
22 October 2024
St William Homes was successful with application 23/00457/FUL at planning committee on 22/10/2024. • Permission took 40 weeks from the original application. • It is currently the vacant former West Ham Gasworks. • The new scheme will include four apartment blocks and two terraces of houses. • With a maximum height of 17 storeys. • There will be 245 residential units: 210 private, 35 affordable. • The affordable is 35 London Affordable Rent homes.
22 October 2024
Application PA/24/01755/A2 has been submitted for: Demolition of the existing building and all structures on site and construction of two part four/part five storey buildings and a 23 storey tower providing up to 145 new residential dwellings (Class C3) and community floorspace (Class F2), the provision of disabled car parking spaces, cycle parking, refuse storage, mechanical plant and associated hard and soft landscaping, including upgrade works to the existing playground on Hawthorn Avenue.
22 October 2024
Application 220957 has gained full planning permission.
21 October 2024
Application 24/00868/AOD has gained full planning permission.
20 October 2024
Permission 21/01650/RESPA has lapsed unimplemented.
18 October 2024
Application 24/03165/FUL has been submitted for: Erection of part 4, part 5 and part 6-storey block of 25 x deck accessed self- contained flats (comprising of: 10x 1-bed, 9x 2-bed, and 6x 3-bed units), with balconies to south and west elevation, communal roof terrace to the 4-storey roof and landscaped communal garden areas.
18 October 2024
Application 21/02347/FUL is being treated as withdrawn.