06 August 2025
Application 77214/APP/2022/3382 us being treated as withdrawn.
04 August 2025
Application DC/25/140992 has been submitted for: Demolition of all existing buildings and comprehensive redevelopment to provide three new buildings, comprising residential dwellings (C3), purpose built student accommodation (sui generis) and commercial floorspace (Use Class E(b) - Cafe; and E(g) - Office/ Light Industrial), together with landscaping, public realm works, improvements to river wall and public riverside walkway, wheelchair accessible parking, cycle parking and refuse/ recycling stores and all associated work.
04 August 2025
Application DC/25/141007 has been submitted for: Demolition of all existing buildings and comprehensive redevelopment to provide three new buildings comprising residential dwellings (C3), purpose built student accommodation (sui generis) and commercial floorspace (Use Classes E(b) - Cafe; E(g) - Office/ Light Industrial; and B8 - Storage unit), together with landscaping, public realm works, improvements to river wall and public riverside walkway, wheelchair accessible parking, cycle parking, refuse/ recycling stores and all associated works.
04 August 2025
Application 25/AP/2203 has been submitted for: Redevelopment of the site comprising demolition of the existing building and construction of two buildings providing Purpose Built Student Accommodation (PBSA) (Sui Generis) and Residential (Class C3), alongside flexible commercial (Class E) floorspace and a café unit (Class E(a)) at the ground floor, together with associated public realm and landscaping works and a new pedestrian route.
01 August 2025
Application 23/00433/FULM has gained full planning permission at appeal. • Permission took 127 weeks from the original application. • It’s currently a vacant former public house with associated parking. • The new scheme will be a single block. • With a maximum height of three storeys. • There will be 30 residential units: all private. The Inspector found that the development would not harm the character and appearance of the area and would provide suitable accessible housing. Also, impacts relating to parking, traffic and living conditions would be acceptable.
01 August 2025
Landseer Development Company was successful with application 25/04219/MOD106 which was approved under delegated powers on 01/08/2025. • Permission took six weeks from the original application. • It is currently two parcels of land and houses EDF energy installation for the transforming and distribution of electricity throughout Central and North West London. • The new scheme will include two apartment blocks. • With a maximum height of 12 storeys. • There will be 89 residential units: 89 private, 0 affordable.
01 August 2025
Application 25/01963/DOV has been submitted for: Deed of Variation to S106 relating to dated 11th September 2023 of planning permission 21/03939/FUL to amend clauses 1.4 and 1.5 in Schedule 6 (Affordable Housing) and associated definitions and affordable housing plans to deliver and maintain affordability of the affordable housing units.
01 August 2025
Application P/2024/4109 has gained full planning permission.
01 August 2025
Application 25/05404/P3JPA has been submitted for: GPDO Prior Approval: Change of use from a use Class E to Class C3 (dwelling houses) to form 32 self-contained residential units.
01 August 2025
Application 25/02632/NMA has been submitted for: Non material amendment to ref: 21/04742/FUL to allow amendments to Block D and C of Phase 1B.
31 July 2025
Application DC/25/140981 has been submitted for: GPDO Prior Approval: Conversion of the upper floors and part of the basement and ground floors from Commercial/Business/Service (Class E use) to residential to provide 28 residential dwellings.
31 July 2025
Application 25/01105/VAR has been submitted for: Section 73 Application to vary Condition Nos.: 2 (Approved Plans), 3 (Accessible Housing), 5 (Energy Statement), 6 (Flood Risk Assessment), 7 (Water Efficiency), 8 (Blue Badge Parking Spaces), 9 (Site Waste Management Plan), 12 (Archaeology), 13 (Piling Method Statement), 17 (Air Quality and Dust Management Plan), 19 (Fire Evacuation Lift), 21 (Cycle Parking), 25 (Public Realm, Landscaping & Play Space), 31 (Odour), 33 (Urban Greening Factor) attached to planning consent 21/01180/FULL dated 21/02/2025.
31 July 2025
Berkeley St William was successful with application 25/P1191 at planning committee on 31/07/2025. • Permission took 14 weeks from the original application. • It currently comprises the former Mitcham gasworks . • The new scheme will include six apartment blocks. • With a maximum height of nine storeys. • There will be 569 residential units: 353 private, 216 affordable. • The affordable is 152 Social Rent, 64 Shared Ownership.
30 July 2025
TT Group was successful with application 2023/03129/FUL at planning committee on 30/07/2025. • Permission took 87 weeks from the original application. • It is currently a Grade II listed former hospital. • The new scheme will include four apartment blocks. • With a maximum height of five storeys. • There will be 140 residential units: 119 private, 21 affordable. • The affordable is 13 Social Rent, eight London Living Rent. • A financial contribution of £2.7m has been agreed to fund delivery of offsite affordable housing.
29 July 2025
Application 2025/01533/PMA56 has been refused. The proposal does not comply with GPDO rules – planning permission is required for external alterations and the proposal fails to provide a completed s106 agreement to remove resident parking rights. Other shortcomings include inadequate daylight, contamination risks, transport impacts and cycle storage issues.
29 July 2025
Duchy of Cornwall was successful with application 25/00879/FUL at planning committee on 29/07/2025. • Permission took 19 weeks from the original application. • It is currently occupied by two buildings used for residential and commercial purposes. • The new scheme will include one apartment block. • With a maximum height of five storeys. • There will be 39 residential units: 21 private, 18 affordable. • The affordable is two Discount Market Rent, 16 Independent Living.
29 July 2025
Rocco Homes was successful with application 23/02944/FUL at planning committee on 29/07/2025. • Permission took 98 weeks from the original application. • It currently contains a flat-roofed, metal framed, brick and breeze block structure and a rear storage unit formally occupied by a steel merchants' workshop. • The new scheme will include one apartment block. • With a maximum height of six storeys. • There will be 21 residential units: 21 private, 0 affordable. • Financial contribution of £305,000 as payment in lieu of on-site affordable housing.
28 July 2025
Application 25/02438/FUL has been submitted for: Demolition of existing structures; and redevelopment of the site to deliver three buildings providing residential (Class C3 and C4) uses, a standalone community and commercial use building (Class E/Class F1), and associated landscaping, cycling parking, car parking, servicing and all necessary enabling works.
28 July 2025
Application 25/P2093 has been submitted for: GPDO Prior Approval: Change of use from office (use class e) to dwellinghouses (use class c3) including 25 x studio homes, 73 x 1 bedroom home and 22 x 2 bedroom homes.
28 July 2025
LB Camden didn't determine the application in 56 days and so it is deemed consented. The borough was going to approve the application but a s106 to secure transport related items caused a distraction.