04 September 2025
Areli Developments was successful with application P/2023/3208 at planning committee on 04/09/2025. • Permission took 93 weeks from the original application. • It is currently a brownfield site. • The new scheme will include five apartment blocks. • With a maximum height of 18 storeys. • There will be 856 residential units: 590 private, 266 affordable. • The affordable is 130 Social Rent, 136 Shared Ownership.
03 September 2025
Application 25/2824/MA has been submitted for: Section 73 application: - A 11,891 sqm (GIA) Multipurpose Leisure Centre (Class F2) (unchanged). - An increase in the total number of residential dwellings (Use Class C3) from 482 to 557. - A reduction of the quantum of commercial and business floorspace (Class E) from 1,070 sqm (GIA) to 255sqm (GIA). - An increase in maximum height of Block A from 9 to 14 storeys, Block B from 19 to 21 storeys, Block C from 16 to 18 storeys, with the maximum heights of Block D and E remaining as consented at 9 and 11 storeys, respectively - Demolition of Bull Tavern (including façade). - Increase in affordable housing provision to provide 38% by habitable room, with tenure as 100% social rent.
03 September 2025
Dolphin Living was successful with application 2019/2458 at planning committee on 03/09/2025. • Permission took 147 weeks from the original application. • It is currently five four-storey residential blocks. • The new scheme will include four apartment blocks. • With a maximum height of 13 storeys. • There will be 208 residential units: 109 private, 99 affordable. • The affordable is 99 London Living Rent.
03 September 2025
Berkeley Homes (North East London) was successful with application 2024/2817 at planning committee on 03/09/2025. • Permission took 34 weeks from the original application. • It is currently occupied by an estate formed of 835 social housing flats. • The new scheme does not provide a definitive block number. • With a maximum height of 21 storeys. • There will be 3,083 residential units: 1,758 private, 1,325 affordable. • The affordable is 583 Social Rent, 742 Shared Ownership.
03 September 2025
Application P/2024/1659 has gained full planning permission.
03 September 2025
Regal London was successful with application PA/24/00812/A1 at planning committee on 03/09/2025. • Permission took 65 weeks from the original application. • It is currently occupied by two warehouses. • The new scheme will include two apartment blocks (five student accommodation blocks also form part of this scheme). • With a maximum height of 18 storeys. • There will be 208 residential units: 0 private, 208 affordable. • The affordable is 143 Social Rent, 65 Shared Ownership.
02 September 2025
London Borough of Bromley was successful with application 25/00800/FULL1 at planning committee on 02/09/2025. • Permission took 26 weeks from the original application. • It is currently vacant. • The new scheme will include two apartment blocks. • With a maximum height of five storeys. • There will be 68 residential units: 0 private, 68 affordable. • The affordable is 55 Social Rent, 13 Supported Living.
02 September 2025
London Land Bromley was successful with application 24/04820/FULL1 at planning committee on 02/09/2025. • Permission took 33 weeks from the original application. • It is currently occupied by a four storey former Department of Health and Social Security office building. • The new scheme will include three apartment blocks. • With a maximum height of 19 storeys. • There will be 138 residential units: 96 private, 31 market (later Living), 11 affordable. • The affordable is 11 London Living Rent.
02 September 2025
Opinion has been sought under ref Z0005.25 for: Redevelopment of the site of up to 1,000 residential units, with 10,350m2 (GIA) of additional commercial space, with public realm improvements and associated landscaping and provision of blue badge parking.
02 September 2025
Application PA25/1620 has been withdrawn.
02 September 2025
Sherrygreen Homes was successful with application 242739 at planning committee on 02/09/2025. • Permission took 38 weeks from the original application. • It is currently a two-storey office building and car parking. • The new scheme will include two apartment block. • With a maximum height of six storeys. • There will be 46 residential units: 46 private, 0 affordable. • Financial contribution of £100,000 towards off-site affordable housing.
01 September 2025
Enfield Council was successful with application 25/02747/NMA which was approved under delegated powers on 01/09/2025. • Permission took three weeks from the original application. • It is currently a residential estate. • This is a hybrid application that proposes a total of 120 residential units. The full application proposes two apartment blocks. • With a maximum height of nine storeys. • There will be 37 residential units: 0 private, 37 affordable. • The affordable is 24 Social Rent, 13 Intermediate. The outline application proposes four apartment blocks. • With a maximum height of nine storeys. • There will be 83 residential units: 0 private, 83 affordable.
01 September 2025
Application HGY/2024/2851 has gained full planning permission.
01 September 2025
Trentworth Properties was successful with application 2024/1590 which was approved under delegated powers on 13/09/2024. • Permission took six weeks from the original application. • It is currently cleared apart from one two-storey building. • The new scheme will include five apartment blocks and one block of terraced houses. • With a maximum height of 10 storeys. • There will be 118 residential units: 94 private, 24 affordable. • The affordable is 17 Affordable Rent, seven Shared Ownership.
29 August 2025
Opinion has been sought under ref 2025/3797/P for: Development involving the demolition of the existing structures on-site and the construction of a mixed-use, life-science and residential scheme, comprising approximately 59,000m2 of life science facilities and 15,200m2/125 residential units in buildings up to a maximum height of 50m Above Ordnance Datum.
29 August 2025
Application 25/2796/MA has been submitted for: Minor material amendment in connection with the planning permission ref. 22/3782/MA dated 17 March 2023 to vary Condition 2; Condition 14; Condition 16; Condition 18; Condition 26; Condition 27; Condition 28 and Condition 62.
29 August 2025
Application DM2025/01068 has been submitted for: Approval of reserved matters to determine the access, appearance, landscaping, layout and scale pursuant to outline approval DM2024/00392.
28 August 2025
Application 2025/02334/PMA56 has been submitted for: GPDO Prior Approval: Change of use of the existing building from offices (Class E) into 137no. self-contained flats (Class C3).
28 August 2025
Application HGY/2024/3315 has gained full planning permission.
28 August 2025
Application PP/25/04416 has been submitted for: Cross boundary (Royal Borough of Kensington & Chelsea and London Borough of Hammersmith & Fulham) detailed planning application for the complete demolition of existing buildings and structures and the comprehensive redevelopment to provide a mixed-use scheme comprising the creation of housing (Use Class C3) (274 homes, including affordable homes (extra care home units and general needs units)), and non-residential floorspace (2,038sqm) comprising commercial, business and service floorspace (Use Class E) and Local Community and Learning floorspace (Use Class F1 a/b and Use Class F2) in new buildings ranging from 5 to 13 storeys with basement, public realm works and other ancillary works including works to the Chelsea Creek wall, and new access arrangements from Lots Road.