20 October 2025
Notting Hill Genesis was successful with application 25/1970/FUL at planning committee on 20/10/2025. • Permission took 22 weeks from the original application. • It is currently a residential area with 11 apartment blocks and 11 houses. • The new scheme will include eight apartment blocks and three terraced houses. • With a maximum height of six storeys. • There will be 329 residential units: 211 private, 118 affordable. • The affordable is 106 Social Rent, 12 Shared Ownership.
17 October 2025
Application 25/AP/2894 has been submitted for: Non-material amendment to planning permission 18/AP/1603 dated 22/12/2020. The proposed scheme comprises 173 market units and 26 social rented units. This has been progressed on the basis that the proposed scheme seeks to improve the affordable housing ratio within the building by securing 30% of the uplift in habitable room above the consented scheme for social rented housing.
17 October 2025
Application 2025/02448/VAR has been submitted for: Variation to Condition 2 (Drawings) of planning permission 2021/03898/FUL granted 27th August 2025.
17 October 2025
Application 23/02689/FUL has gained full planning permission.
16 October 2025
Application 25/03113/EIAFUL has been submitted for: Phased redevelopment of the site including demolition of all existing buildings and structures to erect up to 7 buildings ranging from three to 69 storeys plus basements for a range of land uses comprising residential (Class C3), purpose built shared living (Sui Generis), purpose built student accommodation (Sui Generis), flexible town centre uses/commercial (Class E(a), (b), (d), (e)), community/health uses (Class F2/E(e)), office (Class E(g)) and/or hotel (Class C1), cinema (Sui Generis), soft and hard landscaping, play space, pedestrian and vehicular access, cycle parking, car parking and all other works associated with the development. - Residential dwellings: 1,097 - Co-living: 1,164 units - Student accommodation: 699 units - Hotel: 11,409sqm - Office: 4,085sqm - Flexible retail: 3,968sqm - Cinema: 1,707sqm - Community/medical: 1,780sqm
16 October 2025
London Borough of Croydon was successful with application 25/02016/OUT at planning committee on 16/10/2025. • Permission took 16 weeks from the original application. • It currently has various uses, including: 191 residential units, pre-school, games area, public car parking, and vacant land (former garages site). • This is a hybrid application that proposes a total of 340 residential units. The full application proposes nine apartment blocks and five houses. • With a maximum height of six storeys. • There will be 225 residential units: 0 private, 225 affordable. • The affordable is 215 Social Rent, 10 Shared Ownership. The outline application proposes two apartment blocks. • With a maximum height of 14 storeys. • There will be 115 residential units: 115 private, 0 affordable.
16 October 2025
Landsec was successful with application DC/24/137871 at planning committee on 16/10/2025. • Permission took 51 weeks from the original application. • It currently comprises the majority of the existing covered Lewisham Shopping Centre. • This is a hybrid application that proposes a total of 2,189 residential units. The detailed application proposes three apartment blocks. • With a maximum height of 23 storeys. • There will be 564 residential units: 119 private (multifamily), 445 Co-living, 0 affordable. The outline application proposes 11 apartment blocks. • With a maximum height of 35 storeys. • There will be 1,625 residential units: 1,296 private, 329 affordable. • The affordable is 98 Social Rent, 231 Discount Market Rent or Key Worker housing.
16 October 2025
Application 22/03123/VAR has been withdrawn.
16 October 2025
Application 223478FUL has been appealed under reference 3372230 further to its refusal on 16/05/2025.
16 October 2025
Application 20/0700 has gained full planning permission.
15 October 2025
Application 2025/01945/PMA56 has gained Prior Approval.
14 October 2025
Application 25/03547/VAR has been submitted for: Variation of condition 02, 41 and 42 of Ref: 21/02517/FUL (as amended by 25/03161/NMA) to allow 22 additional residential units, alterations to unit mix, amendments to ground floor landscaping, second stair core to all 4 buildings and increase in height to range between 6 and 15 storeys.
14 October 2025
Wates + LB Harrow were successful with application PL/0501/25 at planning committee on 14/10/2025. • Permission took 32 weeks from the original application. • It currently comprises the now vacant Harrow Civic Centre complex and vacant Social Club, comprising nine buildings with associated surface car parking, and areas of hardstanding. • This is a hybrid application that proposes a total of 1,058 residential units. The full application proposes three apartment blocks. • With a maximum height of 12 storeys. • There will be 530 residential units: 422 private, 108 affordable. • The affordable is 108 London Living Rent. The outline application proposes three apartment blocks. • With a maximum height of 15 storeys. • There will be 528 residential units: 444 private, 84 affordable. • The affordable is 84 London Living Rent.
14 October 2025
Woolbro was successful with application P2025/0523/FUL at planning committee on 14/10/2025. • Permission took 33 weeks from the original application. • It currently accommodates a single-storey medical centre building. • The new scheme will include one apartment block. • With a maximum height of six storeys. • There will be 23 residential units: 11 private, 12 affordable. • The affordable is nine Social Rent, three Shared Ownership.
14 October 2025
Application 25/01858/OUT has been refused. The proposal would have an adverse effect on the local area. It also lacks an adequate s106 agreement with regard to affordable housing, air quality, carbon emission offset, highway works, transport, and local employment opportunities.
14 October 2025
Application 25/01679/OUT has been refused. The proposal would have an adverse effect on the local area. It also lacks an adequate s106 agreement with regard to affordable housing, air quality, carbon emission offset, highway works, transport, and local employment opportunities.
14 October 2025
Application P/2024/2719 has gained full planning permission under delegated powers - it makes design changes including for fire safety.
13 October 2025
Application 25/07396/OUT has been submitted for: Reconfiguration of Phase 5 from the consented 20 townhouses to 87 apartments (Class C3) across three blocks (Buildings 12, 13 and 14) and the associated increase in building footprint, massing and height and the omission of one basement level.
13 October 2025
Application 2025/02818/PMA56 has been submitted for: Change of use of the basement, ground, first, second floors, roof-space and building curtilage from offices (Class E) to 30no. self-contained residential flats (Class C3), comprising of 9no. studio, 8no. one bedroom, 5no. two bedroom and 8no. three bedroom flats.
10 October 2025
Application 2025/02819/PMA56 has been submitted for: GPDO Prior Approval: Change of use of the existing building from commercial, business and service (Class E) into residential (Class C3) comprising of 24no self-contained flats.